Project Overview
  • Main Contractor

    C J O'Shea & Co Ltd

  • Architect

    BUJ Architects

  • Developer

    City & Docklands Ltd

  • Profiles

    Hydro Building Systems (SAPA Building Systems)

  • Awarded / Completed

    2016 / 2018

  • Project Value

    £4.3 million

This project consisted of 1 Main Tower of 24 Floors, where we designed, supplied and installed products with high acoustic features.

This project consisted of 1 Main Tower of 24 Floors, and 2 additional smaller buildings where we designed, supplied and installed SAPA Dualframe 75Si Tilt & Slide Doors, Dualframe 75Si Doors, Dualframe 75Si Tilt & Turn Windows, Dualframe 75Si Windows & 202 Commercial Doors, Aluminium Cladding, Feature Banding & Glass Balustrades.

This site had very high acoustic requirements, and we carried out our own testing to achieve these acoustic requirements. We also carried out complete CWCT Sequence B Testing.

MAKE AN ENQUIRY