Main Contractor
C J O'Shea & Co Ltd
-
Architect
BUJ Architects
-
Developer
City & Docklands Ltd
-
Profiles
Hydro Building Systems (SAPA Building Systems)
-
Awarded / Completed
2016 / 2018
-
Project Value
£4.3 million
This project consisted of 1 Main Tower of 24 Floors, where we designed, supplied and installed products with high acoustic features.
This project consisted of 1 Main Tower of 24 Floors, and 2 additional smaller buildings where we designed, supplied and installed SAPA Dualframe 75Si Tilt & Slide Doors, Dualframe 75Si Doors, Dualframe 75Si Tilt & Turn Windows, Dualframe 75Si Windows & 202 Commercial Doors, Aluminium Cladding, Feature Banding & Glass Balustrades.
This site had very high acoustic requirements, and we carried out our own testing to achieve these acoustic requirements. We also carried out complete CWCT Sequence B Testing.